Felix Bulnes Hospital
Buildings
ABB secures critical power for state-of-the-art hospital in Chile
Chile
Challenge
Due to the size of the switchboards required for such a large-scale project, the principal challenge for ABB was to install space-saving back-up power protection at low cost and with great performance.
Solution
ABB worked with the Felix Bulnes Hospital’s electrical designers to install an innovative solution never before used in Chile the S750DR Selective Main Circuit-Breaker (SMCB), a highly reliable solution suitable for the protection of distribution circuits. 
Outcome
“ABB has a strong track record working with hospitals to ensure continuous power supply. We understand how important this is, not only to the performance of the hospital, but to the lives and quality of care for its patients. We developed a comprehensive solution that, while it had a small footprint, was big on performance.”