ABB to install electrification and automation systems at new cement plant in India
India
Challenge
They needed a solution that would improve engineering efficiency, operator performance and asset utilization, to be able to maximize production.
Solution
ABB will supply with ABB Ability™ Expert Optimizer, an advanced process control solution for controlling, stabilizing, and optimizing industrial processes. 

 ABB will also provide the new cement plant with electrification infrastructure items such as MV Switchgear with MV relays on IEC 61850 communication and LV Switchgear with ABB UMC100.3 intelligent motor controllers which combine intelligent motor protection and control functions and fieldbus communication, and fault diagnosis in a single device.
Outcome
This will allow the cement producer to increase production, minimize carbon footprint and reduce fuel consumption to meet energy usage goals.