Case Study ® ABB 2025
GIGA Data Centers
Data Centers
ABB enables smarter data center solutions for North Carolina-based GIGA Data Center
United States of America
Challenge
GIGA Data Centers was looking for scalable infrastructure to support future growth, while achieving an ultra-low Power Usage Effectiveness.
Solution
As a startup collaboration, ABB and GIGA worked together to iterate and optimize their power infrastructure design to be specific to their needs and work for their customer base. ABB provided the TLE UPS as the main bridge for their backup power, as well as the DPA UPS to provide a modular and scalable system for the network rooms. This design took into account GIGA's growth plans so they can easily scale their capacity.
Outcome
This UPS solution provided GIGA with the capacity and response to be scalable which is essential with the world's ever-increasing data demands.