Case Study ® ABB 2026
Data Centers 
Data Centers
Power Distribution
Better visibility means more power
Challenge
gain a competitive edge, meet global standards on sustainability and handle bigger workloads, faster, better and more efficiently through smart electrification and better visibility into power needs.
Solution
ABB Ability™ Energy and Asset Manager enables the collection of relevant information from ABB devices installed in low- and medium-voltage power distribution system. It also combines data based on environmental parameters (temperature, water, gas). These devices can be connected, by easy plug and play functionality by sharing peer to peer data using latest communication protocols.
Outcome
This not only future proofs the data center but offers built-in visibility into power metrics to ensure ease of installation and immediate functionality throughout the power distribution system.